Projects

In mid-2020 we started the works on Decal, in the Port of Barcelona. This is the construction of 4 new buckets for 20,000m3 deposits, in which hydrocarbons will be stored. The project evolves according to our forecasts, while the metal tanks are being manufactured, the other tank bases are made. The forecast is that the facilities can come into operation next summer. At...

Below we present the documentary clip of the construction project of the new headquarters of Aquaram, in Granollers. In this project Obres Tècniques Lloret we have built a logistics warehouse, the factory, the offices and the I&D laboratory. The architect Salvador Panosa and Enginyeria Pujadas have also collaborated with us....

This is an Obres Tècniques Lloret project for the Hotel Ilunion, in Barcelona. It is a reform carried out to improve some areas of this hotel, a leader in social inclusion in the tourist sector. The reception area, check-in area and dining rooms have been completely refurbished. The rooms have also been updated, adapting them to the new trends. The IHP Project Management...

This is a performance of Obres Tècniques Lloret at the Bellvitge Hospital. It has been modified to access ALCORE-LAB, changing its distribution in order to improve mobility. In this way, we have managed to creat a more accessible space, as well as facilities adapted to the new needs of the hospital. Indus Ingeniería y Arquitectura has also collaborated with us in this action,...

At Obres Tècniques Lloret we took care of the construction of the new entrance and car park for the Merck factory, located in Mollet del Vallès. For this pharmaceutical production plant, we adapted the new accesses with a more modern design, which allows maximum accessibility and comfort, ensuring the free passage of any obstacle. [gallery ids="11618,11621,11624,11627,11630"]...

This is an Obres Tècniques Lloret project for Sebir S.A., a steel wire factory for cold stamping. On this occasion, the industrial construction of a new roof and structure has been carried out for its industrial warehouses in the production area. The existing roof has been replaced and the existing isolation has been improved. We have led the whole process of calculation...

At Obres Tècniques Lloret we carry out larg-scale projects. One of these projects is the construction of the robotic logistics warehouse of Henkel Ibèrica & Solvia, located in Montornès del Vallès. Tec Engineering has collaborated with us in this Project. In these facilities a new packaging line has been built, faster and more sustainable, as well as a new automatic warehouse of last...

At Obres Tècniques Lloret we have been in charge of the construction of the new Aquaram headquarters, in Granollers. In this project we have built a logistics warehouse, the factory, the offices and the I&D laboratory. The architect Salvador Panosa and Enginyeria Pujadas have also collaborated with us. Aquaram is a company dedicated to the manufacture of PVC-U pressure valves and fittings for...

In this project we have worked with the developer Obra Nova Catalana SL, and with the architect Marc Seguí Pié. It is about the adaptation of the premises for the judicial bodies of Mollet del Vallès, located in the building of Can Fàbregas. The building has two floors and more that 2.800m2 of built area. These new facilities guarantee the accessibility to...

At Obres Tècniques Lloret we have collaborated with Team Lab Project for the construction and development of this project. It is about the transformation of the new Urquima Laboratories, of the Uriach Group, located in Sant Fost de Campsentelles. Laboratories dedicated to the manufacture of active ingredients and pharmaceutical products. The geometry of the plant has not prevented to reach the highest...